Page 1 of 1 | 4 Results


2013 Interoperability Status Check Project Report

This report reviews the IIS Interoperability Status Check project, designed to connect with IIS across the US, submit sample MU Stage 2 messages, and verify that the messages can be accepted

AIRA Response Letter

AIRA Responses to CMS Stage 2 Meaningful Use NPRM

AIRA response to the Stage 2 Meaningful Use proposed rules